Installation Instructions - Frigidaire FFLG3900UW Manuel D'installation

Masquer les pouces Voir aussi pour FFLG3900UW:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION INSTRUCTIONS

Gas connection
1. Remove the shipping cap from gas pipe at
the rear of the dryer.
IMPORTANT
DO NOT connect the dryer to L.P. gas
service without converting the gas valve.
An L.P. conversion kit must be installed by a
qualified gas technician.
2. Connect a 1/2 inch (1.27 cm) I.D. semi-rigid
or approved pipe from gas supply line to the
3/8 inch (0.96 cm) pipe located on the back
of the dryer. Use a 1/2 inch to 3/8 inch (1.27
cm to 0.96 cm) reducer for the connection.
Apply an approved thread sealer that is
resistant to the corrosive action of liquefied
gases on all pipe connections.
Manual
Shutoff
Flare
Valve
Union
Open
Nipple
Closed
All connections must be wrench-tightened
IMPORTANT
The supply line must be equipped with an
approved manual shutoff valve. This valve
should be located in the same room as the
dryer and should be in a location that allows
ease of opening and closing. DO NOT block
access to the gas shutoff valve.
14
GAS FLOW
Flare
Union
Flexible
Inlet Pipe on
Connector
Back of Dryer
3. Open the shutoff valve in the gas supply line
to allow gas to flow through the pipe. Wait
a few minutes for gas to move through the
gas line.
Shutoff Valve - Open position
4. Check for gas system leaks with a manom-
eter. If a manometer is not available, test all
connections by brushing on a soapy water
solution.
WARNING
EXPLOSION HAZARD
NEVER test for gas leaks with an open
flame.

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Ffle3900uw

Table des Matières