TEUFELBERGER treeMOTION evo Mode D'emploi page 9

Masquer les pouces Voir aussi pour treeMOTION evo:
Table des Matières

Publicité

1G: Tie a double overhand stopper knot using the first rope on top of the sec-
ond rope at the outer side of the left front D rings. Make sure that the stopper
knot has been aligned correctly!
1H: Repeat using the second on top of the first rope.
Make sure that the stopper knot has been aligned
correctly and faces upwards!
first! Check that the knot sequence is as shown in the picture (dark green, light
green - dark green, light green - from left to right).
Pull the stopper knots tight at the correct distance, applying at least your work
load, i.e. fully equip the harness for the task to be performed, then hang in sus-
pension on ground level. Ensure that, after tightening, the length of the project-
ing rope ends is at least 5 times the rope diameter.
Note! If you have used rope bridges with sewn eyes or a
webbing bridge on your treeMOTION evo before, you need
to adapt the front D rings. Remove the dog bones and re-
place by the metal rope blocker on both sides. Ensure that
the rope blocker is correctly oriented, i.e. on the outside
face of the forward D rings and as shown in the picture
(markings visible and tight fit of metal rope blocker on
forward D ring)! Fix the rope blocker to the front D ring using two M5x16 mm A2
stainless steel screws from the outside and self-securing nuts M5 A2 stainless
steel Nyloc from the inside. Tighten all bolts to the approved torque rating of 5
Nm. New nuts must be used every time.
Note: The locking nuts and end of the bolts must lie below the inner surface of
the forward D rings. The bolt must extend at least 1mm through the locking nut.
rePlacement roPe BrIDges
1I: Repeat steps 1G and
1H at the outer side of
the right front D rings.
Start using the sec-
ond rope on top of the
9

Publicité

Table des Matières
loading

Table des Matières