8. Initial settings for refrigerant leakage detection function
[Display D] Waiting for stabilization
Fig. 8-3

9. Special Functions

A
B
SW1
E
A Circuit diagram example (low noise mode)
B On-site arrangement
C External input adapter (PAC-SC36NA)
A
B
SW2
E
A Circuit diagram example (Demand
function)
B On-site arrangement

9.3. Refrigerant collecting (pump down)

Perform the following procedures to collect the refrigerant when moving the indoor
unit or the outdoor unit.
1 Supply power (circuit breaker).
* When power is supplied, make sure that "CENTRALLY CONTROLLED" is not
displayed on the remote controller. If "CENTRALLY CONTROLLED" is dis-
played, the refrigerant collecting (pump down) cannot be completed normally.
2 After the gas stop valve is closed, set the SWP switch on the control board of the
outdoor unit to ON. The compressor (outdoor unit) and ventilators (indoor and
outdoor units) start operating and refrigerant collecting operation begins. LED1
and LED2 on the control board of the outdoor unit are lit.
* Only set the SWP switch (push-button type) to ON if the unit is stopped. How-
ever, even if the unit is stopped and the SWP switch is set to ON less than
three minutes after the compressor stops, the refrigerant collecting operation
cannot be performed. Wait until compressor has been stopped for three min-
utes and then set the SWP switch to ON again.

10.System control (Fig. 10-1)

E SW 1 - 3 ~ 6
ON
OFF
3 4 5 6
F SW 1 - 3 ~ 6
ON
OFF
3 4 5 6
G SW 1 - 3 ~ 6
ON
OFF
3 4 5 6
A
E
A
F
TB1
TB1
TB4
TB4
TB4
B
B
B
2
2
TB5
TB5
1
C
D
1
Fig. 10-1
10
Stabilized
After 45 minutes
C
D
Red
3
Brown
Orange
Fig. 9-1
1
CNDM
D Outdoor unit control board
E Max. 10 m
C
D
Red
3
Brown
Orange
Fig. 9-2
1
CNDM
C External input adapter (PAC-SC36NA)
D Outdoor unit control board
E Max. 10 m
A Outdoor unit
B Indoor unit
C Master remote controller
D Subordinate remote controller
E Standard 1:1 (Refrigerant address = 00)
F Simultaneous twin (Refrigerant address = 01)
G Simultaneous triple (Refrigerant address = 02)
A
G
TB1
TB4
TB4
TB4
B
B
B
TB5
3 Press
( ) button to confirm. (Fig. 8-3)
FILTER
s How to finish the initial learning
Once the unit's operation is stabilized, the initial learning is completed.
4 Press
button for more than three seconds to cancel the initial learning.
TEST
The initial learning can also be cancelled by pressing
* Refer to the Technical Manual for the refrigerant leakage detection judgment method.
9.1. Low noise mode (on-site modification) (Fig. 9-1)
By performing the following modification, operation noise of the outdoor unit can be
reduced by about 3-4 dB.
The low noise mode will be activated when a commercially available timer or the
contact input of an ON/OFF switch is added to the CNDM connector (option) on the
control board of the outdoor unit.
• The ability varies according to the outdoor temperature and conditions, etc.
1 Complete the circuit as shown when using the external input adapter (PAC-
SC36NA). (Option)
2 SW1 ON: Low noise mode
SW1 OFF: Normal operation
9.2. Demand function (on-site modification) (Fig. 9-2)
By performing the following modification, energy consumption can be reduced to 0–
100% of the normal consumption.
The demand function will be activated when a commercially available timer or the
contact input of an ON/OFF switch is added to the CNDM connector (option) on the
control board of the outdoor unit.
1 Complete the circuit as shown when using the external input adapter (PAC-
SC36NA). (Option)
2 By setting SW7-1 and SW7-2 on the control board of the outdoor unit, the energy
consumption (compared to the normal consumption) can be limited as shown
below.
SW7-1
SW7-2
OFF
OFF
ON
OFF
OFF
ON
3 Because the unit automatically stops in about two to three minutes after the refrig-
erant collecting operation (LED1 and LED2 are lit), be sure to quickly close the
gas stop valve. When LED1 and LED2 are lit and the outdoor unit is stopped, open
the liquid stop valve completely, and then repeat step 2 after three minutes have
passed.
* If the refrigerant collecting operation has been completed normally (LED1 and
LED2 are lit), the unit will remain stopped until the power supply is turned off.
4 Turn off the power supply (circuit breaker).
* Set the refrigerant address using the DIP switch of the outdoor unit.
1 Wiring from the Remote Control
This wire is connected to TB5 (terminal board for remote controller) of the indoor unit
(non-polar).
2 When a Different Refrigerant System Grouping is Used.
Up to 16 refrigerant systems can be controlled as one group using the slim MA re-
mote controller.
Note:
In single refrigerant system (twin/triple), there is no need of wiring 2.
SW1
Function table
1 Compulsory de-
frosting
<SW1>
SW1
2 Error history clear
function
ON
Refrigerant sys-
3
settings
OFF
tem address set-
4
1 2 3 4 5 6
ting
5
6
button.
ON/OFF
Energy consumption (SW2 ON)
0% (Stop)
50%
75%
Function
Operation according to switch setting
ON
Start
Normal
Clear
Normal
Settings for outdoor unit ad-
dresses 0 to 15
OFF

Publicité

Table des Matières
loading

Table des Matières