Boiler Fixing; Fuel Supply - Riello Burners Gulliver RG1RK Manuel D'entretien

Masquer les pouces Voir aussi pour Gulliver RG1RK:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3.
INSTALLATION
THE BURNER MUST BE INSTALLED IN CONFORMITY WITH LEGISLATION AND LOCAL STANDARDS.

3.1 BOILER FIXING

Put on the flange (1) the screw and two nuts, (see fig. 3).
Widen, if necessary, the insulating gasket holes (5).
Fix the flange (1) to the boiler door (4) using screws (2) and (if necessary) the nuts (3) interposing the
insulating gasket (5), (see fig. 2).

3.2 FUEL SUPPLY

The burner is designed to allow entry of the oil supply pipes on either side.
Depending on the oil supply pipes position (to the right or to the left hand side of the burner) the fixing plate
(1) and closing plate (2) should be reversed, (see fig. 4).
1
2325
Fig. 2
Fig. 3
Fig. 4
2
3
GB
S7189
1
D4074

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

362 t13736251

Table des Matières