Nexo NX242 Manuel D'utilisation page 31

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

If the MAIN SYSTEM phase reading appears to be superior to the SUB phase reading, then MAIN
SYSTEM will have to be delayed with a value close to the one given by the geometrical alignment.
If SUB appears to be in advance to MAIN SYSTEM, then SUB will have to be delayed with a value close
to the one given by the geometrical alignment.
Phase alignment can be considered as correct when phase is coincident over the entire overlapping
range (typically an 1 octave from 60 Hz to 120 Hz), and when the overall response is always superior to
SUB's and MAIN SYSTEM's individual response.
USER MANUAL LOAD2_22
DATE: 03/12/2004
INSTALLATION RECOMMENDATIONS
31
PAGE

Publicité

Chapitres

Table des Matières
loading

Table des Matières