Schulte Rain Notice De Montage page 4

Table des Matières

Publicité

GB
Dear customer,
thank you for purchasing this product. We would like to ask you to read the following notes and tips so that you can enjoy this product
for a long time.
checking the product:
check your tap prior to installation for transport damage or other damage that may have occurred. After the installation of the
product no claims for damages will be accepted under the warranty.
Chrome surfaces have certain manufacturing characteristics. These may be hairline scratches or irregularities in the metal. There should
be no cause for concern if you cannot see any such imperfections when standing at a distance of 1,5 metres from the object and under
normal lighting conditions. The overall impressions is conclusive.
Technical Construction Requirements
Scope of use:
This product is intended for connection to a pressurized hot water supply.
When used in conjuction with water heaters from 24kW
The product is not suitable for use with non-pressurized storage (open water systems).
Technical data:
min. flow pressure:
max. operating pressure:
Operating pressure greater than 5 bar = pressure reducer required
Flow rate at 3 bar pressure at hand / and shower head (standard version): 9 l/min.
The valve must be drained separately in case of frost. Emptying of water pipe network is not sufficient.
Mounting
Flush before and rinse after installation according to DIN 1988 (run at main tap about 3 min. open water)
Connection via hose with G1/2 port.
1 bar
5 bar
- 4 -

Publicité

Table des Matières
loading

Table des Matières