Wallbox PULSAR PLUS Guide D'installation page 11

Masquer les pouces Voir aussi pour PULSAR PLUS:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 39
The colours shown are not subject to international
standards. Always check the correct connection.
3. Screw
In the event that the supply scheme does not include a neutral line connection with a voltage lower than
145 V, follow the next configuration steps:
Bi-phase setup (2P)
From left to right:
L1 (Current line)
N (Current line)
Protective earth
4. Closure of the device (I-7)
Step 4.1: Reconnect the ribbon cable to the cover.
Step 4.2: Close the front cover, taking special care
with the fitting and ensuring that the O-ring remains
in place.
Step 4.3: Secure the cover by tightening the Torx
screw.
1. Screw
2. Screw
I-6. 1
I-6.2: Single-phase setup (1P)
I-6.3: Three-phase setup (3P)
I-7
L1 (Current line)
N (Neutral line)
Protective earth
N (Neutral line)
Protective earth
L1, L2, L3
(Current lines)
11

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Commander 2

Table des Matières