Extel SUNPOWER 40 Guide D'installation Et D'utilisation page 30

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 4
Test mode (00)
This mode is used to test your installation (if the connection of the panel and the load is correct).
If LED 1 is off and LED 3 is on: Lack of light. The battery was not charged correctly
If LED 1 is on and LED 3 is off: The battery was charged correctly
Automatic mode (08)
The load is automatically controlled.
When the ambient lighting is low, the controller activates the load after 10 minutes.
When the ambient lighting is high, the controller deactivates the load.
Manual mode (09)
The load is manually controlled.
A short press on the settings button (fig.3-1) activates the load. A second short press on the button deactivates
the load (like a switch).
Dusk mode
The load is automatically controlled. Two methods of operation are possible in this mode:
1 lighting sequence (01 to 07): When the ambient lighting is low, the load is activated after 10 minutes for a
defined period of time (see table). Once this period is ended, the load is deactivated.
2 lighting sequences (10 to 39): When the ambient lighting is low, the load is activated after 10 minutes for a
defined period of time (see table). Once this period is ended, the load is automatically deactivated. After this first
sequence, a second sequence will be activated a few hours before sunrise. The load will be automatically deactiva-
ted as soon as the ambient lighting is high after 10 minutes.
- Low level : the voltage of the panel is less than 5V
- High level : the voltage of the panel is greater than 6V
This operating mode requires the length of the night to be known. The default value is 12 hours. This value will
be recalculated by the controller according to the geographical area, which can take approximately 2 nights. You are
therefore advised not to connect the load until after this adjustment period.
See table below
d. Fastening the photovoltaic panel
- To ensure optimum performance the photovoltaic panel must be positioned in such a way that it is able to capture
the maximum amount of solar power during the day. This means that the direction and angle of the panel must be
calculated according to its installation location.
Recommendation: installing the photovoltaic panel at a 45° angle facing towards the South provides the
optimum conditions for capturing the maximum amount of solar power.
Use of a mounting bracket for fastening the selected panel angle to suit your needs is recommended (bracket not
supplied).
- Select the appropriate location for installing the photovoltaic panel. The panel must receive the maximum amount
of sunlight during the day and during different periods of the year in order to operate correctly.
As a result the following checks must be made in order to verify whether the position selected is correct:
- Check that there is sunlight present for most of the daytime at the selected installation location.
- Check that the installation location is not surrounded by thick vegetation or anything capable of creating shade.
- Check that the direction and angle of the solar panel are correct.
Warning: initially the battery charge will not be at the optimum level. It takes several days of
charging for your system to reach optimum capacity.
This system will allow you to have lighting for around 8 hours per day (subject to optimum installa-
tion conditions and length of sunshine period).
GB
CFI EXTEL SUNPOWER 40 - 04/2011 - V1

Publicité

Table des Matières
loading

Table des Matières