Joannes ARN H 80 Notice Technique page 24

Chaudieres pressurisées en acier
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

ARN H 00 ÷ 100 BOILER CASINGS
- Wrap the glass wool around the boiler body leaving the bulb well on the right side exposed.
- Insert the wires connecting the burner to the control panel in the lower slits of panel (1S) and (1D), allowing for the
opening direction of the manhole.
- Fit the lower panel (1S), inserting the fold into the square tube and repeat the same procedure with the upper panel (2S).
- Fit the upper panel (3S) on the boiler; fit the control panel on the panel (3S); uncoil the thermometer and thermostat
capillaries and insert the bulbs in the wells.
- Fit the panels (1D) (2D) and (3D) ensuring that the capillaries are inserted in the slot provided in the panel (3D); securing
the control panel to panel (3D).
Key
P
Bulb wells
TR1-2 Regulation thermostats
TS
Safety thermostat
TM
Circulator consent thermostat
TMC
Boiler thermometer
- 2
-
ASSEMBLY

Publicité

Table des Matières
loading

Produits Connexes pour Joannes ARN H 80

Table des Matières