Joannes ARN H 80 Notice Technique page 23

Chaudieres pressurisées en acier
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

ARN H 0 ÷ 00 BOILER CASINGS
- Wrap the glass wool around the boiler body leaving the bulb well (P) on the right side exposed.
- Insert the wires connecting the burner to the control panel in the lower slits of panel (1S) and (1D), allowing for the
opening direction of the manhole.
- Fit the panel (1S), inserting the upper fold into the square tube and the lower fold to the boiler side frame.
- Fit the upper panel (2S) on the boiler and fit on this panel the control panel; uncoil the thermometer and thermostat
capillaries and insert the bulbs in the wells.
- Fit panel (1D) as indicated under point b); fit panel (2D) ensuring that the capillaries are inserted in the slot provided in
the panel itself. Securing the control panel.
- Secure the upper panels by screws and close the passage holes with special caps (see figure)
Key
P
Bulb wells
TR1-2 Regulation thermostats
TS
Safety thermostat
TM
Circulator consent thermostat
TMC
Boiler thermometer
- 2
-
ASSEMBLY

Publicité

Table des Matières
loading

Produits Connexes pour Joannes ARN H 80

Table des Matières