DELIVERY
LAIA GTA, GTAX and GTF Heating Units are delivered knocked down on a wooden
pallet, containing the following packages:
LAIA 25 GTA Confort S
LAIA 30 GTA Confort S
GTA Heating Units featuring DHW cylinder with electric heater option are delivered in
an additional package with the heater element.
The LAIA GTAF is supplied with an additional packing which contains two Ø 80 mm
pipes (1-metre long), with baffle intended for the last runs of the fresh air supply/flue
gas removal pipe.

INSTALLATION AND ASSEMBLY

Warning
- Observe current Regulations.
- Size and design the chimney for the LAIA GTA, GTAX & GTAF Heating Units in
compliance with current local Regulations for Heating Systems in Buildings
which apply.
- The installation should include a switch, a circuit breaker or other omnipolar
disconnect switch to isolate all power supply lines to the Heating Unit.
- Ensure there is a 230V-50Hz single-phase, earthed power point as well as a
water supply and drain facility near the installation site of the unit.
- When fitting approved chimneys, please observe the manufacturer's specifications.
- To remove possible residue from the chimney, it is advisable to have a handhole
at the base for this purpose.
Location
As a rule, the location should be chosen according to conditions such as access
of fuel, flue gas removal, ventilation, drain, etc.
Always check that the boiler is level on its chosen installation base and that there
is sufficient clearance from surrounding walls to permit future maintenance
operations.
Assembly
1
2
- Screw the return pipe (1) in the DHW cylinder. If no drain cock (2) (optional) has
been installed in the tapping, screw in a 1/2" gasketed plug.
LAIA 45 GTA Confort S
1. Boiler body, fully assembled.
2. Casing.
3. DHW cylinder.
4. Hydraulic unit.
5. Control panel.
6. Burner.
7. Heating pump.
5
- Cover the boiler body with the insulating blanket (4), passing it between the
lower tie-rods and the boiler body itself.
- Put the insulating material on the back (5) of the boiler.
- Rest the cylinder U-support (6) on the front and back sections.
- Rest the cylinder (7) on the U-support.
8
- Fit the Flexvent-H automatic floatvent (8), supplied with the hydraulic unit, in the
tapping for this purpose located at the top back side of the DHW cylinder.
- In the LAIA 45, the mentioned Flexvent-H automatic floatvent should be fitted
in the top end of the "boiler flow connecting pipe" when installing the hydraulic unit.
- "In LAIA 25 & 30, screw the retention valve 1/2» into the top hole on the front
element, with the arrow pointing out from the boiler. In LAIA 45, screw the retention
valve 1/2" into the hydraulic assembly above the pump, with the arrow pointing
vertically upwards.
- Make the connection between the cylinder and the boiler through the hydraulic unit
provided
13
- On LAIA GTAF boilers only, fasten the air (14) intake duct to the rear casing
panel using the cable tie provided (13).
- On LAIA GTAF boilers only, fasten the air (14) intake duct to the rear casing
panel using the cable tie provided (15).
3
16
- Screw the brackets (16) of the control panel box to the casing side panels.
4
6
14
7
27
14
15
11