Domnick Hunter PNEUDRI DX102 Manuel D'installation, De Mise En Service Et D'entretien page 24

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

DO NOT
Install the Desiccant Air Dryer flat against a wall.
Electrically connect a Heat Regenerative (DH) model without a neutral.
Install the Desiccant Air Dryer without adequate pre- and after filtration.
Install multiple banks less than 500mm between centres. (The instrumentation shroud will not open).
Manifold multiple banks in a centre fed (fork) arrangement.
B) Unpacking
Every care is taken with product packaging. After carefully removing your dryer from its crate and packing material,
carry out a thorough inspection for any sign of transit damage incurred after leaving the factory.
Any damage should be reported immediately to the carrier and/or from whom it was purchased.
Provision is made for lifting as a complete unit by eye bolts located in the top of the dryer.
Ensure that the eye bolts are tightly secured before attempting to lift. The preferred method of lifting is by using a
crossbar. (Each bank of a multibank installation must be lifted separately).
If it proves necessary to manoeuvre the dryer into an awkward space, take care not to place any stress on the
instrumentation shroud as this may cause damage.
22

Publicité

Table des Matières
loading

Table des Matières