Télécharger Imprimer la page

Preparation - Kohler K-2286 Guide D'installation Et D'entretien

Masquer les pouces Voir aussi pour K-2286:

Publicité

Mark and drill the anchor holes.
Marquer et percer les orifices d'ancrage.
K-2286
Marque y taladre los orificios de anclaje.
14-3/4" (37.5 cm)
K-2294
14-5/8" (37.1 cm)
Backing
Support
Refuerzo
1/2" (1.3 cm) D.
Mark and drill the floor here.
Marquer et percer le sol ici.
Marque y taladre el piso aquí.

Preparation

Install the water supplies and drain piping according to the roughing-in
information. Install the supply stops so the handles will not touch the pedestal
when fully open.
Install sufficient backing behind the finished wall to provide a secure material for
the anchoring devices.
Apply six self-adhesive gaskets (provided) to the top edge of the pedestal as
shown.
Mark the centerline on the floor.
Refer to the roughing-in information, and position the pedestal on the floor
centerline location at the required distance from the finished wall.
NOTE: The lavatory must be supported by the pedestal.
Carefully lift the lavatory into place on the pedestal, and slowly move the
pedestal as required to ensure proper fit in the desired location.
Level the lavatory, and add additional self-adhesive gaskets as needed to level.
Locate the two lavatory anchoring holes, and mark the hole locations on the
finished wall. Mark the location of the hole in the pedestal base onto the floor.
Carefully remove the lavatory from the pedestal. Move the pedestal from the area.
Préparation
Installer les alimentations d'eau et tuyauterie du drain selon l'information du plan
de raccordement. Installer les arrêts d'alimentation de façon à ce que les poignées
ne touchent pas la colonne quand elles sont entièrement ouvertes.
Kohler Co.
29-1/2"
(74.9 cm)
to Floor
au sol
al piso
9-1/4" (23.5cm)
5
Apply adhesive gaskets.
Appliquer des joints adhésifs.
Aplique empaques adhesivos.
1068258-2-A

Publicité

loading

Ce manuel est également adapté pour:

K-2294