Weber Summit 89796 Guide De L'utilisateur page 5

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

BUILT-IN GAS LINE LOCATIONS
GENERAL CONSTRUCTION DETAILS
®
Summit
Built-In side burner unit should be on site before construction begins.
All dimensions have a tolerance of plus or minus +/- 1 / 4 " inch (6.35 mm).
Provide access for a corrugated gas line depending on the location of the side burner in
relation to your main gas supply and regulator position.
Area should be kept clear of sharp, jagged, or extremely abrasive surfaces to avoid
possible damage to gas supply lines. Exercise caution when pulling gas lines through
built-in structure.
A 3/8 inch (9.52 mm) stainless steel corrugated gas line should be used to connect the
side burner to the regulator accessory coupling.
WARNING: Do not use a rubber gas hose.
GAS LINE LOCATIONS
1
3/8" (9.52 cm) SAE Stainless Corrugated Gas Line
2
Typical Tank Cabinet Location
MOUNTING THE SIDE BURNER
Connect the corrugated gas line to the side burner valve located on the back right
hand side of side burner.
®
WWW.WEBER.COM
GAS INSTRUCTIONS
1
2
TEST CONNECTIONS
All connections and joints must be thoroughly tested for leaks in accordance with
local codes and all listed procedures in the latest edition of ANSI Z223.1/NFPA 54.
Do not use an open flame to check for gas leaks. Be sure
there are no sparks or open flames in the area while you
check for gas leaks. This will result in a fire or explosion
which can cause serious bodily injury or death, and damage
to property.
Be sure to secure the side burner unit with non corrosive screws
anchored into the finished surface of the "island structure" .
Replace the plastic plug on the front mounting hole to conceal the
screw once side burner is secure.
DANGER
5

Publicité

Table des Matières
loading

Table des Matières