Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

installation guide

Always use two people when setting up the base.
STEP 1
Place the bed base box in a desired location with the bottom of
the box facing up.
Remove the binding straps and packing materials, making sure
not to puncture the box with any sharp objects.
STEP 2
Remove the bed base from
the box. Unfold the bed
making sure to keep the
bottom of the bed facing
upwards.
STEP 3
To install Headboard Brackets (sold separately)
see instructions on page 12.
Legs are shipped fully assembled. Alternative heights in 3"
increments can be achieved by removing leg segments.
To install the legs, thread the leg into frame, and tighten by hand.
Do not over tighten.
For customer support, call Customer Service: U.S. 1-800-499-1965 | Canada 1-800-268-4414
6
STEP 4
To sync two bases see detailed installation
instructions on pages 10-11.
It is recommended to leave the battery backup strap attached
to the power supply for use when needed. 2 9V batteries (not
included) will be required for its use.
STEP 5
Uncoil input Power Cord (connected to
Control Box's power port) and plug into
Power Supply.
STEP 6
Uncoil the Power Cord and connect to the
Power Supply. Place Power Supply on the
ground and extend from the base. Ensure
that the Power Supply and all attached
cords are directed toward the desired
surge protector.

Publicité

Table des Matières
loading

Table des Matières