Sabiana Carisma Whisper CFF-ECM Instructions Pour L'installation, L'utilisation Et La Maintenance page 34

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

EN
UP-ECO power unit installation for CB-E
control
Instructions for installing the power unit when not
factory installed.
The basic units, supplied without controls, are
equipped with an electrical terminal board prepared
for connection to external controllers.
To install the power unit proceed as follows:
2.13
1
1. It is necessary to remove the cable fastener (1)
and the terminal board group with the related
motor cables (2) from the right side of the fan
coil unit.
2. Remove the terminal board applied on the
shoulder by unscrewing the two self-tapping
screws. The two holes shown in the figure are
those that will then be used to fix the power
board.
34
2
2.14
3. Remove the power board cover. The electronic
board is supplied with the cables connected.
2.15
4. Fix the power board using the 2 self-tapping
screws supplied.

Publicité

Table des Matières
loading

Table des Matières