This Must Be Considered During Installation; Tools; Abbreviations - Weka 100.2224. 10 Notice De Montage, D'utilisation Et D'entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5.4.2. This must be considered during installation!

At least two people are required to assemble the log cabin.
Please drill pilot holes for all screw connections to avoid damaging the wood. The following symbol
in the instructions will indicate when this is necessary:
The pallet on which the cabin is transported comprises two floor beams which are to be used in the
assembly of the cabin.
In order to check the right angles, measure the diagonals and make any necessary corrections
until you have the same values.
When laying the roof boarding, care should be taken to ensure that the roof boards are not pressed
tightly into each other. Subsequent swelling of the wood as a result of moisture is unavoidable.
We recommend that you also apply a further layer of roof paper with bitumen cold bonding agent.
(Not includedin the delivery!)

5.5. Tools

You should have the following tools to hand before beginning assembly:
Tape measure
Drill
Electric screwdriver Hammer Pencil
Burring iron
Rubber
mallet
Saw
Universal cutter
Cord
Spirit level
Spanner
Vice

5.6. Abbreviations

RW = Rear wall
WS = Wall thickness
We hope you have a successful installation and wish you many happy hours enjoying your
weka product.
© Copyright HRB 3662
14
Techn. Änderungen vorbehalten!

Publicité

Table des Matières
loading

Table des Matières