Télécharger Imprimer la page

Fronius 4,100,214 Instructions De Montage page 9

Extension système mig/mag

Publicité

Les langues disponibles

Les langues disponibles

Procedure
(continued)
Fig. 4 Water filter
16. Perform a trial run and check the cooling circuit for tightness.
17. Check correct flow controller operation by draining the coolant. At a flow rate below
18. Replace the cooler side panel.
19. Refill with coolant.
Maintenance
1.
2.
0.7 l/min the power supply unit should switch off automatically.
Sealed burner system ... Flush or replace filter pipe in 800 hr service intervals.
Open burner system (double sheath gas nozzle) ... Flush or replace filter pipe in
500 hr service intervals.
12. Insert the water filter (Fig. 4) – see
Fig. 3 – and connect the PVC hose to
the plug-in connector (red nut).
13. Fit the power supply unit to the cooler
and make electrical connections.
14. Connect the water return hose (red)
of the connecting hose pack to the
water filter plug-in connector.
15. Connect the water feed hose (blue) of
the connecting hose pack to the plug-
in connector (black nut).
3

Publicité

loading