Freezer Installation; Step 1 - Unpack Freezer - Haier HFC3501ACW Manuel D'installation

Masquer les pouces Voir aussi pour HFC3501ACW:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

FREEZER INSTALLATION

STEP 1 - UNPACK FREEZER

Do not puncture refrigerant tubing.
Follow handling instructions carefully.
Flammable refrigerant used.
Failure to do so can result in death, explosion or re.
IMPORTANT: Handle with care when moving freezer to avoid either damaging the
refrigerant tubing or increasing the risk of a leak.
IMPORTANT: When moving the freezer, never tilt it more than a 45° angle. This could
damage the compressor and the sealed system. If the freezer has been placed in
a horizontal position for any period of time, wait 24 hours before plugging in the
freezer to allow the refrigerant to settle.
1. Remove and dispose of/recycle all packing materials. This includes the foam
base and all adhesive tape. Remove all protective packaging covering the
freezer.
2. Remove user manual and other printed material before turning on the freezer.
3. Clean the exterior surface with a soft cloth.
8
WARNING
Fire or Explosion Hazard

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Hf50cw20wHf50cm23nwHf71cw20wHf71cm33nwHf71cl53nw

Table des Matières