Install Leveling Legs; Make Gas Connection - Whirlpool W10562336B Instructions Pour L'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALL LEVELING LEGS

1.
Prepare dryer for leveling legs
To avoid damaging floor, use a large flat piece of cardboard
from dryer carton; place under entire dryer. Firmly grasp
dryer body (not console panel) and gently lay dryer down
on cardboard.
IMPORTANT: If laying dryer on its back, use the cardboard
corner posts the dryer was packed with to avoid damaging
the back of the dryer. Lay the dryer on its side if you do not
have the cardboard corner posts the dryer was packed with.
2.
Screw in leveling legs
Flange
Models with riser
Models with riser:
Using a wrench, screw legs into cabinet until foot flange
touches the riser. Foot is fully installed when bottom of foot
is approximately 1/2" (13 mm) from bottom of the riser.
Models without riser:
Using a wrench and tape measure, screw legs into leg holes
until bottom of foot is approximately 1
bottom of dryer.
Now stand the dryer on its legs. Slide the dryer until it is
close to its final location. Leave enough room for electrical
connection and to connect the exhaust vent.
NOTE: Refer to Dryer Dimensions in the Location
Requirements.
Flange
Models without riser
/
" (35 mm) from
3
8

MAKE GAS CONNECTION

1.
Connect gas supply to dryer
Flared
male fitting
Remove red cap from gas pipe. Using a wrench to tighten,
connect gas supply to dryer. Use pipe-joint compound
on threads of all non-flared male fittings. If flexible metal
tubing is used, be sure there are no kinks.
NOTE: For LP gas connections, you must use pipe-joint
compound resistant to action of LP gas. Do not use
TEFLON
tape.
®†
2.
Plan pipe fitting connection
D
C
A. 3/8" flexible gas connector
B. 3/8" dryer pipe
A combination of pipe fittings must be used to connect dryer
to existing gas line. A recommended connection is shown.
Your connection may be different, according to supply line
type, size, and location.
3.
Open shut-off valve
Closed valve
A
Open shut-off valve in supply line; valve is open when handle
is parallel to gas pipe. Then, test all connections by brushing
on an approved noncorrosive leak-detection solution.
Bubbles will show a leak. Correct any leaks found.
Non-flared
male fitting
B
C. 3/8" to 3/8" pipe elbow
D. 3/8" pipe-to-flare adapter fitting
B
Open valve
A
B
9

Publicité

Table des Matières
loading

Table des Matières