GreenWorks Commercial 2528102 Manuel Opérateur page 15

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation
Connect the boundary wire to the charging station as follows:
Remove the protective cover on the charging station and thread
1
the wire behind the tabs into the channel at the rear of the
charging station.
2
Press the connector onto the metal pins on the charging station
(marked with left and right arrows).
NOTE: Make sure the boundary wire to the right of the charging station
is connected to the arrow pointing right and the same for the left side.
EN
15
Version 3 - 2021.03.11

Publicité

Table des Matières
loading

Table des Matières