Télécharger Imprimer la page

CLINIMAX Simex CLEANFLOW Manuel De L'utilisateur page 16

Publicité

Especialistas en
colectividades
3. Tools and Accessories
Necessary Tools: Drill with appropriate bits, screwdriver, level,
measuring tape, and wrench if needed.
Personal protective equipment, such as gloves and safety
goggles.
Included Accessories: 4 screws (4x50 mm), 4 wall plugs (5 mm),
Allen key (No. 5), and installation template..
4. Safety Considerations
Before working on the electrical installation, ensure that the
power supply to the work area is disconnected to prevent
accidents.
Ensure that the installation complies with local electrical
regulations and applicable safety standards.
5. Final Checklist Before Installation
Solid wall prepared to support the dryer.
Height correctly marked according to recommendations.
Compatible electrical circuit with proper grounding and sufficient
capacity. Power supply disconnected.
Tools ready, and personal safety ensured.
Especialistas en
colectividades
16

Publicité

loading