VAN STORAGE SOLUTIONS
ATTENTION: PLEASE READ AND UNDERSTAND ALL INSTRUCTIONS AND WARNINGS
BEFORE ASSEMBLING, INSTALLING OR USING THIS PRODUCT.
FOR ELECTRIC VEHICLES – Drilling into electrical wiring may damage vehicle systems and may cause bodily harm. This
equipment should be installed by qualified personnel familiar with this type of vehicle and the hazards involved. To prevent
damage to components underneath the floor, mainly the battery and high voltage system components, refer to your vehicle
manufacturer's instructions or the manufacturer's website for more information.
PLAN YOUR VAN (TIPS FOR FASTER INSTALLATION)
Installing your WEATHER GUARD
cables so you don't accidentally cut something important.
mat. Cut clearance holes for fasteners and spacers. Always wear eye protection when drilling
or cutting.
Your WEATHER GUARD
96901-3-01. If you think you might want to change to it in the future, put an extra nut between
the driver's side panel and the center panel to allow enough space.
Mount the upper corners of the bulkhead as close to the van inside walls as possible for a
sturdy and quiet installation.
BOLT KIT
DESCRIPTION
1/4-20 Blind Fasteners
1/4-20 x 5/8" Hex Head Bolts
1/4-14 x 3/4" Self-Drilling Screws
1/4-20 Nylon Lock Nuts
1/4-20 x 1-1/4" Hex Head Bolts
1/4" Flat Washers
Floor Mounting Spacers
Blind Fastener Installation Tool
1/4-20 x 2-1/4" Hex Head Black Bolt
1/8" x 1" x 4" Foam Pads
INSTALLATION MANUAL
Bulkhead is very clear cut following these instructions.
®
Bulkhead can be up-graded with a swing-door conversion kit,
®
QTY.
6
25
4
23
4
7
5
1
1
2
BULKHEAD
Model Number 96101-3-01
WEATHERGUARD.COM
INSTALLATION TIME
Approximate installation time: 60 minutes
per unit depending on van equipment
installation experience.
TOOLS REQUIRED
Electric Drill
1" Hole Saw
5/16" Nut Driver Bit
Pencil or Marker
Hammer
Center Punch
Drill Bits: 1/8", 5/16", 13/32"
3/8" Ratchet Drive
Sockets: 5/16", 7/16"
Level
Carpenter's Square
Open End Wrenches: 7/16", 9/16"
1