6. Standard equipment
Item
Designation
A
Feed chute
B
Basic unit
C
Wheel carrier
D
Discharge flap
E
Ejection chute extension
F
Strip
G
Wheel
H
Wheel cap
I
Blade disc
J
Torx screw
P5x20
K1
Nut M10
K2
Lock nut M8
L1
Washer
L2
Washer A10
M
Torx screw
P5x50
N
Flat head bolt
M8x45
O
Hexagon screw
M10x55
P
Retaining washer
Q
Closure screw
R
Wheel pin
S
Pin
T
Deflector
U
Upper spacing ring
V
Lower spacing ring
W
Protective cap
X
Installation tool
Y
Torx wrench
0478 216 9908 A - EN
Item
Designation
Z
Combination spanner
•
Instruction manual
•
Engine
instruction manual
2
Qty.
7. Preparing the machine for
1
operation
1
1
Risk of injury:
Observe the safety instructions in
1
the section "For your safety" ( 4.).
1
● Place the machine on level and firm
1
ground when performing all the
2
operations described.
2
1
5
7.1 Installing ejection chute
extension
2
● Fit ejection chute extension (E)
2
onto basic unit and install screws (J)
2
(1 - 2 Nm).
2
1
7.2 Installing wheels and chassis
2
● Attach left and right wheels (G)
with wheel pin (R), washer (L1),
washer (L2) and nut (K1) to
1
wheel carrier (C).
1
● Press wheel caps (H) onto wheels.
2
● Place wheel carrier as shown on firm
2
and level ground and fit basic unit (B)
into position.
2
1
● Insert flat head bolts (N) on the left side
and screw on lock nuts (K2), but do not
1
tighten them yet.
1
Install Torx screw (M) on the right side
1
(1 - 2 Nm).
1
● Tighten nuts (K2) (10 - 12 Nm).
1
Qty.
7.3 Installing the discharge flap
1
● Set garden shredder on its back.
1
1
● Insert strip (F) into ejection chute
extension. Install screws (J) (1 - 2 Nm).
● Lift garden shredder into upright
position.
● Position discharge flap (D) on ejection
chute extension. Ensure that the ribs (1)
inside the flaps on the left and right are
correctly located in the guide groove of
the ejection chute extension (2) when
attaching.
● Press in pins (S) on left and right.
7.4 Opening and closing the
discharge flap
3
Opening the discharge flap:
● For shredding, fold the discharge
flap (D) upwards and allow the tab (1)
to engage in the ejection chute
extension.
Closing the discharge flap:
4
● For transport or space-saving storage,
5
lift the tab (1) slightly and fold away the
discharge flap (D) downwards.
7.5 Installing the blade disc
Observe the installation sequence
and tightening torque of
52 - 60 Nm.
Ensure correct position of upper
spacing ring (U) to both blades
when installing.
6
7
8
37