Installation
Instructions
Questions? Call 833-4BODEWELL (833-426-3393) or visit our Website at: GEAppliances.com
BEFORE YOU BEGIN
Read these instructions completely and carefully.
FOR YOUR SAFETY
Read and observe all WARNINGS and CAUTIONS
shown throughout these instructions.
While performing installations described in this
booklet, gloves and safety glasses or goggles
should be worn.
IMPORTANT –
Observe all governing codes and
ordinances.
• Save these instructions for local inspector's use.
Note to Installer –
•
instructions with the Consumer.
Note to Consumer –
•
for future reference.
• Skill level – Installation of this appliance requires
basic mechanical skills.
• Completion time– 1 hour
•
installer.
•
covered under the Warranty.
WARNING
•
open circuit breaker before beginning installation.
this appliance.
•
head or body under disposer; unit could fall during
removal or installation.
•
conductor can result in a risk of electric shock. Check
with a qualified electrician or service representative if you
are in doubt that the appliance is properly grounded.
• If house wiring is not 2-wire with ground, a ground
must be provided by the installer. When house wiring
compound and aluminum-to-copper connectors.
49-4000307 Rev 1
In Canada, call 1.800.561.3344 or visit our Website at: GEAppliances.ca
Be sure to leave these
Keep these instructions
PREPARATION
2. Remove old disposer or sink flange assembly.
3. Inspect drain line. If it is heavily coated with
hardened grease and accumulations, rout out
with a plumber's snake.
4. Remove old sealing materials and gasketing from
sink opening, both top and bottom.
NOTE:
any materials to prevent leaks.
WHAT YOU WILL NEED
screwdriver
ADDITIONAL MATERIALS YOU
MAY NEED
Disposer
7