Compact Commercial Softener Owner's Manual
VERY IMPORTANT! Where a brine drum overflow could cause damage, a 1/2" I.D. overflow line MUST be installed
on drum and connected to a drain. Make sure the drain or overflow line is not higher than brine fitting.
NOTE: Clear area along wall where PVC drain line will be run to floor drain. KineticoPRO does not recommend
running flexible tubing across the floor or along walls, as it may be kicked out of discharge point at floor
drain, or line may become pinched resulting in improper backwashing.
When installing a plastic component in line, it is recommended that grounding straps be put in place BEFORE the
lines are actually cut to ensure that the ground is never broken.
When installation is complete, plumbing lines MUST be chlorinated for sanitation. Common household bleach may
be used. The amount of bleach will vary on plumbing size, lengths and fixtures.
NOTE: A clean grade of salt is strongly recommended. DO NOT use rock salt.
Read all steps, guides and rules carefully before installing and using the KineticoPRO Softener.
KineticoPRO CC Series Softener Installation
1. Determine location to install equipment. Make sure that the unit will be on a flat surface. Test water to confirm unit
is properly sized for installation. If sand/silt or turbidity is present, a separate prefilter should be installed.
A ladder should be used for all work overhead that would be beyond your natural reach. If working
continuously at a height of six feet or more, the appropriate safety devices must be employed.
2. Install with by-pass valving. Note the inlet and outlet arrows on valve head.
3. For Hot Water Applications, the addition of a mixing valve, thermometer and check valve are recommended. This
will prevent overheating of the softener during off periods or during initial daily start-up.
• Position mixing valve on hot/cold line, prior to softener.
• Position thermometer after mixing valve.
• Position check valve after softener, but before hot water appliance (such as a commercial dish machine).
By-pass Valving
Inlet
Outlet
Drain
Overflow