EZ Smart GCI8-I Guide D'utilisation page 8

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3
The blower is designed to attach to a
standard extension pole with a standard
thread, but it is a must to use one that is
strong enough to hold the weight of this
blower.
Make sure the Lock Nut is loosened to allow
the pole to be inserted. Then insert the
threaded side into the Pole Chamber and
turn the pole counter-clockwise until it is
tight, but DO NOT OVER-TIGHTEN.
4
After inserting the pole, tighten the Lock
Nut by turning it clockwise until tight, but
DO NOT OVER-TIGHTEN.
You are now ready to use the blower.
5
Turn the unit on by pressing the large On/
Off switch. This is a large push button so it
can be pressed against the bottom of the
gutter or similar surface to turn on or off.
This is the recommended method to turn on.
Operation
7

Publicité

Table des Matières
loading

Table des Matières