Télécharger Imprimer la page

LED2WORK TUBELED 40 II Integrated RGB-W Manuel D'utilisation page 10

Publicité

Les langues disponibles
  • FR

Les langues disponibles

5 | Connection
Suitable connection material, cables and accessories can be found in the accessory range of LED2WORK.
PIN assignment of the M12 connector is as follows:
PIN allocation
PIN 1
= 24V DC
PIN 2
= 24V DC
PIN 3
= GND
PIN 4
= 24V DC
PIN 5
= 24V DC
6 | Maintenance and Care
The LED light is maintenance-free. Do not make any alterations to the light.
The LED light sources mounted in the light are connected to the luminaire housing in a special way (thermal coupling)
and may react sensitively to electrostatic discharges (ESD). Improper replacement of the illuminant or other compo-
nents may impair the tightness of the light. That is the reason why repairs may only be carried out by the manufactur-
er or by persons authorised and qualified by the manufacturer.
Turn off the light before cleaning and let it cool down completely. Clean the outside of the light with a soft, dry and clean
cloth. To remove excess dirt, moisten the cloth with water. Never use aggressive cleaning agents, as these may cause
discolouration of the housing.
10 | BA TUBELED_40 II Integrated RGB-W . BA 01/2024
Schematic drawing of M12 plug
LED colour:
green
LED colour:
blue
LED colour:
red
LED colour:
white
Further colours can be displayed by gating two or three PINs simultaneously. Do not
operate the white light colour simultaneously with the coloured light channels.
Get in touch with us for more information.
The light is not equipped with a ON/OFF switch. Usually you switch the light ON or OFF
via external switches of machines or systems.
Do not open the light!
No liability is assumed for damages resulting from the use of unsuitable cleaning agents.

Publicité

loading