Télécharger Imprimer la page

SolaX Power X3-Hybrid-G4 Serie Manuel D'installation page 70

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 8
• Meter/CT port connection
1. CT connection diagram
Grid
Public grid
electricity
* The arrow on the CT must point at the public grid.
* CT-R must be connected to L1, CT-S connected to L2, and CT-T connected to L3 in
accordance with the L1, L2 and L3 of the inverter's Grid port.
2. Meter connection diagram
* Please ground the GND terminal of Meter1 if you want to connect a meter.
If the user has other power generation
equipment (such as inverter) at home and
wants to monitor both, the inverter
provides Meter2 communication function
t o m o n i t o r t h e p o w e r g e n e r a t i o n
equipment.
For more information, please contact us.
CT-T
L1
L2
L3
N
Household Meter
the direction of CTs
L line
CT
L1
L2
L3
N
PE
Household Meter
Grid
L1 L2 L3 N
CT-S
CT-R
This is the Meter/CT
port at the bottom
of the inverter.
out
in
Meter1
three-phase
meter
Meter2
(three-phase)
meter
L1 L2 L 3 N
Loads
Loads
out
in
other power
generation
equipment
67

Publicité

loading