V.ORLANDI E 50 Instructions De Montage, D'utilisation Et D'entretien page 43

Crochet d'attelage
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION, OPERATING AND MAINTENANCE INSTRUCTIONS
INSTALLATION, OPERATING AND MAINTENANCE INSTRUCTIONS
5)
Tighten the castellated nut (3) with a torque wrench as follows:
Coupling
E 503
E 504
E 505
E 506
E 509
E 510
6)
Insert the split pin (2) through the castellated nut and the hole on the thread of
the tie rod (9). Open the two halves of the split pin and press them back against
the castellated nut;
N
Never slacken the castellated nut back to allow the split pin to be
O
inserted. If necessary, tighten the castellated nut further until one of the
T
holes in the shaft aligne with one of the castellations in the nut.
E
Fit the nut cover (1).
7)
E 509
DRAWBAR COUPLING E 50
Torque
M=350 -
430 Nm
M=500 -
611 Nm
M=500 -
611 Nm
M=500 -
611 Nm
M=550 -
700 Nm
M=600 -
750 Nm
E 506-E 510
E 509
E 506-E 510
PAG.
11/32
CHAP . 2
REV. F

Publicité

Table des Matières
loading

Table des Matières