Electrical System - Thetford SANICON 400S Mode D'emploi

Table des Matières

Publicité

Hose Barb Planning
Regardless of installation selection, plan to minimize stress points on the hose.
RECOMMENDATION: Plumb the hose barb AT OR NEAR BOTTOM of the compartment with the hose barb pointing AWAY
NOTICE
from the RV coach.
90
o
Hose Barb -
Plumbed from Bottom

Electrical System

2A
K4
Ref.
Description
K1
Macerator Pump
K3
Macerator Switch
K4
35A Fuse/Breaker
Fig. 2 represents recommended wiring confi guration. Other wiring
confi gurations are possible based on your installation.
Wiring confi guration MUST include internal over-tempera-
ture switch and relay for protection of pump.
Pump requires a 12-VDC/35 AMP dedicated circuit with 35
AMP breaker or fuse between main bus or battery.
Wire size is dependent on distance between pump and
power source. Actual wire sizes should be calculated ac-
cording to installation.
Wire Gauge Size Chart
If Wire Gauge for distance from
source* is:
12 VOLTS - Install
* Distance measured assumes power
and ground wires
®
SANICON
Turbo Model 400S - Permanent Bayonet Mount
o
90
Hose Barb -
Plumbed from Side
Fig. 2
Switch Box Assembly
2B
85
86
0-18 feet
19-32 Feet
(Included)
10 Gauge
8 Gauge
Fig. 3
4
o
90
Hose Barb -
Plumbed from Back
K3
K1
Ref.
Description
2A
Battery
2B
Relay
2C
Over-Temperature Switch (90°C) normally closed
2D
Ground
While the pump is turned on, verify electrical system
!
NOTICE
AVISO
CAUTION
AVIS
by measuring voltage at motor; (must be 12V).
Improper installation may cause damage to motor or
decrease pump effi ciency.
The positive and negative wires should be braided to
NOTICE
prevent radio interference during operation.
33-50 feet
6 Gauge
Pump Assembly
2C
18G BLU
18G BLU
Included in product
Circuit Breaker
35 amp
97652 Rev. C (04.05.18)
2D
2D

Publicité

Table des Matières
loading

Table des Matières