Zehnder Pumpen WX Série Manuel D'utilisation page 9

Masquer les pouces Voir aussi pour WX Série:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Table of contents:
Declaration of Conformity
1. General
1.1 Application
1.2 Queries and ordering
1.3 Technical data
1.4 Areas of application
2. Safety
2.1 Marking of information in the instruction for use
2.2 Personnel qualifications
2.3 Dangerous arising due to non-compliance with safety advice
2.4 Safety conscious working
2.5 Safety information for owner / operator
2.6 Safety information for maintenance, inspection and fitting
2.7 Non-manufacturer modification and spare part production
2.8 Unauthorised usage
3. Description
4. Installation and commencement of operation
5. Service / Maintenance
6. Warranty
7. Disposal
8.Technical Modification
9. Fault, possible reason and recovery
Appendix
Spare part list
Spare parts drawing
______________________________________________________________________________________________________
We the following
declare that the pump Series WX/HWX conform the following specifications:
- EEC-low voltage specifications 93/68/EWG, app. I
- EMV-Specifications 92/31/EWG und 93/68/EWG
- 2006/42/EG
Applied harmonised norms, particularly
- EN 809
standing 1998
- EN 60 335-1
standing 2006
- EN 60 335-2-41 standing 2004
- EN 50 081-1
standing 1993
- EN 50 082-1
standing 1994
Grünhain-Beierfeld, 22.12.2009
Matthias Kotte
Product development manager
_________________________________________________________________________________________________________________
To avoid damages we deliver the pressure gauge separately. Please mount this pressure gauge at the marked position in the order as follows:
- Remove dummy plug
- Screw in pressure gauge with O-ring and nut (O- ring between pump housing and nut)
- Tie up the nut after adjusting the pressure gauge.
Declaration of Conformity
- In accordance with EEC-low voltage specifications 93/68/EWG, app. I
- In accordance with EMV-Specifications 92/31/EWG und 93/68/EWG
- In accordance with 2006/42/EG
ZEHNDER Pumpen GmbH
Zwönitzer Straße 19
08344 Grünhain-Beierfeld,
Installation pressure gauge!
9
page
9
10
10
10
10
10
11
11
11
11
11
11
11
12
12
12
12
13
13
14
14
14
22
23
GB

Publicité

Chapitres

Table des Matières
loading

Table des Matières