Installation; Before Installing; Required Tools; Lock Installation - Ayr Int Lock Pro Manuel D'utilisation

Table des Matières
Les langues disponibles

Les langues disponibles

3. INSTALLATION

3.1 Before installing

When unbonxing, check that all components are included.
Check the compatibility of your smartphone with the int_egra
APP at the following link:
https://ayr.es/compatibilidad-smartphone/

3.2 Required tools

3.3 Lock installation

1 - Determines the optimum position of the lock on the door.
RECOMMENDED PLACEMENT
in the case of another position ,
ALTERNATIVE POSITION
SLIDING DOOR POSITION
Recommended HEIG H T
1,6m from the groun d
note the measurement
from the groun d
mm
EN
Click!
ø5 drill bit for metalic
or armoured door
ø4 drill bit
for wooden door
44
Table des Matières
loading

Ce manuel est également adapté pour:

508

Table des Matières