Télécharger Imprimer la page

Campbell Hausfeld CE5002S Manuel De L'opérateur page 13

Publicité

Les langues disponibles

Les langues disponibles

2.
Remove the pressure switch cover by loosening
the screw (see Figure 9). Use a Phillips
screwdriver (not included). Pressure switch styles
may vary.
3.
Familiarize yourself with the pressure switch
once cover is removed.
4.
Remove ground screw. Install strain relief on
pressure switch. DO NOT tighten strain relief on
power cord until wiring is complete. Insert the
bare wires (black, white, bare/green) through
the strain relief.
Attach bare/green ground wire first to ground
screw on pressure switch body.
Look for the "Line" markings on pressure
switch. Install Line wires and tighten terminal
screws.
5.
Tighten strain relief nut. Place a flathead
screwdriver (not included) into raised notch and
tap screwdriver with hammer (not included)
until tight.
Tighten strain relief screws to hold power cord
securely. Replace the pressure switch cover
(knob must be in the same position as when
removed to sit correctly in place). Tighten the
pressure switch screw with Phillips screwdriver.
Check that switch is in the OFF position. Follow
break-in procedure starting on page 13.
Figure 9
Tank Pressure
Gauge
ASME Safety
Valve
Figure 10
Terminal Screw
Black Line Wire
Figure 11
Strain Relief
Figure 12
11
Screw
Motor Terminal
Motor Power
Cord
Motor Cord
Ground
Strain Relief
Screw
Line Terminal
White Line Wire
Bare/Green
Ground
Wire
Power Cord
Strain Relief
Nut
Strain Relief Screw

Publicité

loading