Télécharger Imprimer la page

Kohler K-306 Guide D'installation page 9

Publicité

Les langues disponibles

Les langues disponibles

Cold Supply 1"
Copper Tube
This feature faces downward
for back-to-back installation.
5. Back-to-Back Valve Installation
Install both valves following the valve installation instructions.
The supplies to one of the valves will be reversed.
Remove the plaster guard, cap, cap assembly, and collar from the
valve with the reversed supply connections.
Rotate the cap assembly and collar 180° (tab on the bottom).
Reassemble and securely tighten the screws.
Reinstall the plaster guard.
Kohler Co.
All manuals and user guides at all-guides.com
Hot Supply 1"
Copper Tube
Plaster Guard
Screws
180˚
Cap
Assembly
9
1012679-2-C

Publicité

loading