Télécharger Imprimer la page

Ledvance Area Flood 4A Guide D'installation page 8

Publicité

Les langues disponibles

Les langues disponibles

*Required for DLC Luna and Dark Sky compliance
Fixed mount bracket (round pole):
1.
Turn the power off.
4.
Make the wiring connections according to
the wiring diagram. Restore power and
check that the fixture is working properly.
4106888
2.
Feed the power cord through the fixed bracket
and attach it to the fixture using the four
included bolts.
5. Shown is fixture mounted with
0 degree tilt for Luna and Dark Sky
Compliance.
3.
Mount the fixed arm to the
pole using the included bolts.
Install the top bolt and hang
the fixture on the bolt using
the keyhole slot to keep the
fixture in place while
securing the second bolt.

Publicité

loading

Produits Connexes pour Ledvance Area Flood 4A