Télécharger Imprimer la page

Ledvance Area Flood 4A Guide D'installation page 7

Publicité

Les langues disponibles

Les langues disponibles

*Required for DLC Luna and Dark Sky compliance
Fixed mount bracket (square pole):
1.
Turn the power off.
4.
Make the wiring connections according to
the wiring diagram. Restore power and
check that the fixture is working properly.
4106888
2.
Feed the power cord through the fixed
bracket and attach it to the fixture using
the four included bolts.
5. Shown is fixture mounted with
0 degree tilt for Luna and Dark Sky
Compliance.
3.
Mount the fixed arm to the pole
using the included bolts. Install
the top bolt and hang the
fixture on the bolt using the
keyhole slot to keep the fixture
in place while securing the
second bolt.

Publicité

loading

Produits Connexes pour Ledvance Area Flood 4A