Télécharger Imprimer la page

SSS Siedle 130 Information Produit page 6

Steel

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 8
English
Application
Camera 130 or camera 180 for
Siedle Steel. Available for the sys­
tems In­Home bus, Access or as a
system­free camera.
Electrical voltage
Mounting, installation and servicing
work on electrical devices may only
be performed by a suitably qualified
electrician.
1 In the case of video systems, the
following mounting situation must
be avoided at all costs:
• direct backlight
• direct sunlight
• very bright image backgrounds
• highly reflective walls opposite the
camera
• lamps or direct light sources
Mounting
2 Recommended mounting height
appr. 1.60 m to centre camera.
3 Pick-up angle of the camera with
an angle of aperture of appr. 130°
4 Pick-up angle of the camera with
an angle of aperture of appr. 165° in
the full screen mode.
5 Unscrew the camera at the
mounting plate, tilt forward at the
top and remove from the mounting
plate.
6 With an angle of aperture of
appr. 165°, the pick-up angle of
the camera can be adjusted to any
mounting situation. Open the flap
on the back of the module with the
aid of a screwdriver.
7 Set the required picture excerpt
from the camera view (1 to 9) or full
screen (0) using the rotary switch.
Once the required picture excerpt
has been set, close the flap and
mount the module.
6
8 Select the picture excerpt based
on the existing mounting situation.
a Picture excerpt (1-3)
top camera alignment
b Picture excerpt (4-6)
central camera alignment
c Picture excerpt (7-9)
bottom camera alignment
Terminal assignment
SBCM 653-.../SBCM 658-...
TaK
In­Home bus
TbK
camera branch
Ta
In­Home bus
Tb
Vc
Camera actuation
GND
b
Power supply 12 V AC
c
SACM 673-.../SACM 678-...
V1
Video signal
V2
(two­wire FBAS)
V3
Camera supply
V4
V5
Actuation of
V6
video output
SCM 613-.../SCM 618-...
+M
Supply voltage
­M
10–50 V DC
Vc
Camera actuation
­
VKA
Actuation of camera
distributor
A1
Potential­free contact
A1
b
Power supply 12 V AC
c
Coaxial connection
L/S
L = lead, S = shield
Installation
Installation, commissioning and pro­
gramming are described in the rel­
evant system manual and enclosed
with the line rectifier/server.
Measurement points
The measurement points of the
functional units which are located
parallel to the terminals are acces­
sible when mounted. For measure­
ments, the test shaft cover must be
removed. After measuring, replace
the test shaft cover.
Servicing
Release the operating panel using
the enclosed mounting key and take
it off.
If a camera has to be exchanged,
this is unplugged at the terminal
block and replaced.

Publicité

loading