Télécharger Imprimer la page

Architectural Area Lighting SLD2 Instructions D'installation page 4

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION INSTRUCTIONS - SLD2
SLD/PT/4S/AC
(REFERENCE ONLY)
FIXTURE ASSEMBLY
NOTES:
For replacement LED Assemblies and Drivers please contact Current Lighting for any replacement parts.
Contact your local distributor or agent to confirm parts availability prior to ordering replacement parts.
95059205 Rev. A
701 Millennium Boulevard Greenville, SC 29607 (864) 678-1000
SAVE THESE INSTRUCTIONS
Post Top Mount
INSTALLATION STEPS:
1. TURN OFF ALL POWER.
2. CONNECT FIXTURE LEADS TO FEED WIRES (VERIFY SUPPLY
VOLTAGE AGAINST FIXTURE LABELING), SECURE WITH WIRE TIE
OR OTHER MEANS OF STRESS RELIEF TO PREVENT
DISCONNECTION.
3. SLIDE LUMINAIRE OVER TENON OR POLE. (BEST FITS OVER 3"
OD TENON OR POLE)
NOTE: INSTALLATION SHOULD NOT BE LEFT UNATTENDED UNTIL
THE LUMINAIRE IS PROPERLY SECURED WITH SCREWS.
4. SET ROTATIONAL ALIGNMENT IF DESIRED.
5. TIGHTEN SCREWS SECURELY AND EVENLY IN AN
ALTERNATING PATTERN.
6. TURN ON POWER AND TEST FIXTURE.
7. INSTALLATION IS COMPLETE .
Tools Required:
Hex (Allen) Wrench - 5/32
NOTE STREET SIDE LABEL AND ORIENT FIXTURE ACCORDINGLY
(6) SET SCREWS
TORQUE SCREWS TO
130 IN LBS
WIRE CONNECTORS
(BY OTHERS)
4in OD POLE WITH 3in OD 3in TALL TENON
(REFERENCE ONLY)
STREET
SIDE
J-BOX
BLACK
WHITE
GREEN
VIOLET(+)
PINK(-)
NOTE:
VIOLET & PINK WIRES FOR
DIMMING OPTIONAL.
(WIRE COLOR MAY VARY
BASED ON SUPPLY
TO INCOMING
VOLTAGE )
POWER SOURCE
www.currentlighting.com
SHEET 4 OF 8
FIXTURE
LINE
COMMON
GROUND
DIM (+)
DIM (-)

Publicité

loading