Télécharger Imprimer la page

Trevi NBS 228 Instructions D'assemblage

Piscines ovales

Publicité

Les langues disponibles

Les langues disponibles

Liens rapides

Dear Customer
Congratulations! You have purchased a pool of superior quality and durability. To achieve the best possible results,
follow the instructions carefully. Failure to follow the installation procedures may result in damage to your pool or
property and void your warranty. We recommend that you make a preliminary study of the instruction booklet to
familiarize yourself with the different parts of your pool. Make sure that you understand each step thoroughly before
you begin assembling.
We strongly recommend having your pool installed by a professional.
WARNING: Be sure you have read and understand the "Safety Information" sheets
before you begin your pool installation.
WARNING: For your safety, your pool is not designed for diving and/or jumping head first.
1
When selecting the site for your pool, take into account city by-
laws regarding fences and utilities laws pertaining to electrical
cables as well as the landscaping which you are planning once
the pool is installed.
1) Drive a stake into the ground at points A and B respecting the
distance of the straight section between those two points (A-B).
2) Draw two half circles respecting the radius (R).
3) Join the two half circles with straight lines respecting the width
between these two lines (D).
4) Verify that the total length is consistent. (E)
Chart 1.1 - Grass removal area (Figure 1.1)
MODEL
10'x16'
10'x19'
10'x22'
12'x18'
12'x21'
12'x24'
15'x24'
15'x30'
18'x33'
Please do not dive. Diving may result in permanent injury or death.
SITE PREPARATION
DISTANCE (A-B)
RADIUS (R)
1.67m (5' 6")
1.82m (6' 0")
1.67m (5' 6")
2.75m (9' 0")
1.67m (5' 6")
3.65m (12' 0")
1.98m (6' 6")
1.82m (6' 0")
1.98m (6' 6")
2.75m (9' 0")
1.98m (6' 6")
3.65m (12' 0")
2.43m (8' )
2.75m (9' 0")
2.43m (8' )
4.57m (15' 0")
2.89m (9' 6")
4.57m (15' 0")
ASSEMBLY INSTRUCTIONS
OVAL POOLS NBS
We wish you a most pleasant and refreshing summer.
5) Add 15cm (6") wide trenches on each side, respecting the length
(F).
6) Remove all grass from the area you have just outlined.
WIDTH (D)
TOTAL LENGHT (E)
5.18m (17' 0")
3.35m (11')
6.09m (20' 0")
3.35m (11')
3.35m (11')
7.01m (23' 0")
5.79m (19' 0")
3.96m (13')
6.70m (22' 0")
3.96m (13')
3.96m (13')
7.62m (25' 0")
4.87m (16')
7.62m (25' 0")
4.87m (16')
9.44m (31' 0")
5.79m (19')
10.36m (34' 0")
Trevi 228/230/248/250/278/280
CORRIDOR (F)
2.08m (6' 10")
2.99m (9' 10")
3.91m (12' 10")
2.08m (6' 10")
2.99m (9' 10")
3.91m (12' 10")
2.99m (9' 10")
4.82m (15' 10")
4.82m (15' 10")

Publicité

loading

Sommaire des Matières pour Trevi NBS 228

  • Page 1 ASSEMBLY INSTRUCTIONS OVAL POOLS NBS Trevi 228/230/248/250/278/280 Dear Customer Congratulations! You have purchased a pool of superior quality and durability. To achieve the best possible results, follow the instructions carefully. Failure to follow the installation procedures may result in damage to your pool or property and void your warranty.
  • Page 2 SITE LEVELLING SITE LEVELLING 10x19, 15x24, 12x21 For an oval pool, the bottom must absolutely be levelled, using a carpenter's level and a straight plank. Eliminate any protrusions. (25cm) 3-1/4" (8cm) (25cm) Ensure that the surface is free of debris such as rocks, wood, etc. 10"...
  • Page 3 BOTTOM DRAIN ASSEMBLY (if applicable) Dig a hole 30 cm (12") wide by approximately 25 cm (10") deep in the center of the circumference. From the center hole to the projected location of the pool motor, dig a 15 cm (6") wide trench. Place the removed soil aside to be used later to cover the hose.
  • Page 4 STRAIGHT SECTION BUTTRESS ASSEMBLY (continued) 2) Refer to Illustration 4.2. Assemble the buttress post using 3) Refer to Illustration 4.3. Cover the bolt heads with bolt cap bolts 1/2" X 3" X #13 (12,7 mm X 76,2 mm) (U), nuts (UU) and covers (W) and insert the styrofoam block (X) at both ends of foot washers (V).
  • Page 5 TENSION STRAPS ASSEMLBY 1) Study illustrations and chart carefully. You are now ready to as- Illustration 6.1 semble the metallic tension straps. Refer to indications on the chart TENSION for the exact number of tension straps per row according to their STRAPS respective pool size.
  • Page 6 WALL INSTALLATION Add sand. Choose the filter location beside a round section (never in a straight section). The starting point should be at that location where the skimmer and return holes are, and as close as possible to the fil- tration system.
  • Page 7 SAND BASE FINISHING You can now spread approximately 10 cm (4") of compacting sand all around the inside base of the wall in order to protect the liner from the cutting edges of the bottom tracks and the stone dust (if WALL 12"...
  • Page 8 VINYL LINER INSTALLATION (continued) Installation detail of a bead liner with top track. PUMP RETURN FITTING Hang the liner on the top of the wall and install the top track to se- cure. After you remove the vacuum cleaner, you may install the return fit- ting.
  • Page 9 UPRIGHT POST INSTALLATION Attach the uprights to the bottom plate with two (2) screws “Z”, which you will find in the hardware bag. Uprights must be installed outside the flanged part of the bottom plate and into the two notchs of the bottom track. ‘’Z’’...
  • Page 10 SEAT CAP INSTALLATION Put the seat cap on the inside section of the seat and interlock with the upright. Secure the seat cap with one (1) screw “Z”. Snap the cap logo on top of the upright and secure the bottom with one (1) screw ‘’Z’’.
  • Page 11 FILTRATION SYSTEM ASSEMBLY Assemble skimmer, inlet, drain, filter, pumps, hoses according to separate manufacturer’s instructions. Note: See 'Safety Information" Manual. PARTS LIST * SEE DRAWING PARTS NEXT PAGE ITEM DESCRIPTION POOL WALL (finished lenght, inch) BOLT & NUT FOR 52" (OR 54") WALL POOL LINER PLASTIC COUPLER (SOLD SEPARATELY) TOP SEAT - ROUND SECTION...
  • Page 12 PARTS LIST ROUND SECTION STRAIGHT SECTION...
  • Page 13 SAFETY AND FUN GO TOGETHER! SAFETY INFORMATION Read this before installing your above-ground pool. 12 775, Brault Street, Mirabel, Quebec, Canada J7J 0C4 Phone: 1 800 44-TREVI (1 800 448-7384) Fax: 1 866 777-0167...
  • Page 14 ABILITY SHOULD THIS STEP BE OMITTED. the pool. If you need more stickers or if some are missing, you can order these at info@trevi.ca or by calling 1 800 44TREVI Before installing your pool, you should check local regulations such...
  • Page 15 USAGE SAFETY INFORMATION...
  • Page 16 INSTRUCTIONS D’ASSEMBLAGE PISCINES OVALES NBS Trevi 228/230/248/250/278/280 PRÉPARATION DE L’EMPLACEMENT Choisissez l'emplacement idéal pour votre piscine en tenant 5) Ajoutez ensuite sur chaque côté des tranchées d’une largeur de compte des lois municipales sur la distance des clôtures, celles 15cm (6”) et d’une longueur correspondante (F).
  • Page 17 NIVELLEMENT DU TERRAIN ET EXCAVATION NIVELLEMENT DU TERRAIN 10x19, 15x24, 12x21 Pour une installation de piscine ovale on doit absolument faire un fond plat. Nivelez la surface très attentivement en utilisant un niveau de (25cm) (25cm) 3-1/4" (8cm) menuisier et une planche très droite. Éliminez toutes les petites 10"...
  • Page 18 INSTALLATION DU DRAIN DE FOND (optionnel) Creusez un trou de 30 cm (12") de largeur par environ 25 cm (10") de profondeur en plein centre de la circonférence. Creusez une tranchée d'environ 15 cm (6") de largeur à partir du trou central jusqu'à...
  • Page 19 ASSEMBLAGE DES POTEAUX DE RENFORT (suite) 2) Se reférer à l’illustration 4.2. Fixez les poteaux de renfort à l'aide 3) Se reférer à l’illustration 4.3. Recouvrir les têtes de boulon avec du boulon 1/2" X 3" X #13 (12,7 mm X 76,2 mm) (U) des écrous les capuchons pour boulons (W) et insérer les embouts de mousse (UU) et des rondelles (V).
  • Page 20 ASSEMBLAGE DES BANDES DE TENSION 1) Consultez les illustrations et le tableau et étudiez-les attentive- Illustration 6.1 ment. Vous pouvez maintenant assembler les bandes de tension BANDES DE TENSION métalliques. Référez-vous aux indications du tableau pour le nombre de rangées de bandes métalliques à assembler et le nombre de ban- des par rangée en fonction des dimensions de piscine.
  • Page 21 INSTALLATION DU MUR D’ACIER Déversez le sable. Choisissez l'emplacement du filtreur vis-à-vis une section ronde (ja- mais une section droite). Le point de départ se fera vis-à-vis cet emplacement pour que les trous d'écumoire et de retour d'eau soient les plus près possible du filtreur. Lors de l’installation du mur d’acier, il est important de le faire à...
  • Page 22 FINITION DU FOND Étendez maintenant environ 10 cm (4") de sable à compactage au bas du mur intérieur de façon à former un remblai destiné à protéger MUR D'ACIER 30 cm (12") 30 cm (12") la toile des extrémités coupantes des rainures du bas et de la pous- sière de roche (si applicable).
  • Page 23 INSTALLATION DE LA TOILE DE VINYLE (SUITE) Détail de l’installation de la toile avec jonc d’accrochage. RETOUR D'EAU Accrochez la toile sur le sommet du mur et installez la rainure du Vous pouvez installer le retour d'eau une fois l'aspirateur retiré. haut par dessus la toile.
  • Page 24 INSTALLATION DES POTEAUX (section ronde ) Fixez les poteaux aux plaques du bas à l’aide de deux (2) vis “Z” que vous trouverez dans le sac de quincaillerie. Le poteau rentre dans les deux encoches de la rainure du bas. Il est à...
  • Page 25 INSTALLATION DU COUVRE-JOINT Accrochez le couvre-joint sur le rebord intérieur des sièges et l’en- clencher sur le poteau. Fixez-le à l’aide d’une vis “Z” sur le dessus. Accrochez le cap logo dans la partie superieur du poteau et fixez- le à l’aide d’une (1) vis ‘’Z’’ à la base.
  • Page 26 MONTAGE DU SYSTÈME DE FILTRATION Assemblez l’écumoire, le drain de fond, le retour d’eau et le système de filtration selon les instructions d’assemblage des manufacturiers. Note : Voir les “Informations de sécurité”. LISTE DES PIÈCES * VOIR LE DESSIN DES PIÈCES SUR LA PROCHAINE PAGE ITEM DESCRIPTION MUR D'ACIER (LONGUEUR RÉELLE, PIEDS-POUCES)
  • Page 27 LISTE DES PIÈCES (suite) SECTION RONDE SECTION DROITE...
  • Page 28 ET AVANT TOUT PAR LA SÉCURITÉ CONSIGNES DE SÉCURITÉ Veuillez lire ceci avant de procéder à l’installation de votre piscine hors terre. 12 775, rue Brault, Mirabel, Québec, Canada J7J 0C4 Téléphone : 1 800 44-TREVI (1 800 448-7384) Télécopieur : 1 866 777-0167...
  • Page 29 Si vous désirez obtenir des autocollants additionnels, vous pouvez triques sont nécessaires. Il se peut que les règlements de votre lo- en commander à l’adresse INFO@TREVI.CA ou au 1 800 44TREVI. calité exigent que votre piscine soit installée selon certaines marges Nous ne fabriquons pas d’échelles ni de marches de piscine : votre...
  • Page 30 CONSIGNES DE SÉCURITÉ LORS DE L’UTILISATION DE LA PISCINE...

Ce manuel est également adapté pour:

Nbs 230Nbs 248Nbs 250Nbs 278Nbs 280