Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

3. Installation

3.1. Location

The gate can be fitted either inside the opening or stairway or on the wall besides the
opening or stairway.
Setup inside an opening,
use templates
1
Always make sure that the safety barrier is in the correct position according to the tem-
plate. Before mounting the gate, decide whether it should open left to right or vice
versa, and therefore which side will be most suitable for the handle.
Markings on the top face
indicates the position to
secure the gate to its brac-
kets.
Setup in front of an ope-
and
ning, use templates
3
and
Mesh extension direction
based on the three set po-
sitions.
2
6
When fitting at the top of
stairs, place the gate at
1
the top floor level 15 cm
(6 in) from the first step.
When fitting at the bottom
of stairs, place the gate at
the lowest stair.
Direction of the locking
hooks to lock the gate.
15 cm
6 in

Publicité

Table des Matières
loading

Table des Matières