Télécharger Imprimer la page

IPC Portotecnica SILVER Jet DS 1810 M Manuel D'instructions page 23

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 25
TABLE OF ROUTINE MAINTENANCE TO BE PER-
FORMED BY THE USER
Description of operations:
Check power cable - pipes - high pressure
connectors
Ist oil change in H.P. pump
Subsequent changes in H.P. pump
Change and clean fuel filters
Clean fuel tank
Clean water filter
These intervals refer to normal working conditions. For heavy duty use decrease the interval for each job.
For maintenance and/or repairs, use only original spare parts which offer the greatest characteristics of quality and
reliability. Failure to use original spare parts absolves the manufacturer from all liability and transfers it to the
If the machine is to remain inactive for a long period, disconnect the supply sources, drain the tank(s) of all the operating fluids
and protect any parts that could be damaged by the accumulation of dust.
Grease the parts that could be damaged by drying out, such as the supply hoses. When bringing back into use, ensure that
there are no cracks or cuts in the water supply hoses.
Oil and chemical products must be disposed of according to current legislation.
If you decide that the cleaner is no longer to be used, render it inoperative by removing the electric power cable. Ensure that all
parts of the cleaner that could be a source of danger are made harmless, especially for children who might use the old cleaner
for play. As the cleaner is considered special waste, dismantle it and divide the material according to type, then dispose of them
as required by the legislation in force.
Do not use parts dismantled for scrap as spare parts.
English
TABLE OF
BE PERFORMED BY THE TECHNICAL SERVICE
CENTRE
Description of operations:
Boiler:
Each use
Clean Coil
Descale coil
After 50 hours
Clean fuel pump
Every 500 hours
Change fuel nozzle
Regulade electrodes
Every 100 hours
Change electrodes
Every 100 hours
Every 50 hours
Change seals on H.P. pump
Change lanze nozzle
Calibrate and check the safety devices
IMPORTANT:
person carrying out the operation.
PERIODS OF INACTIVITY
SCRAPPING
- 23 -
EXTRAORDINARY MAINTENANCE
TO
Every 200 hours
Every 300 hours
Every 200 hours
Every 200 hours
Every 200 hours
Every 500 hours
Every 500 hours
Every 200 hours
Once a year

Publicité

loading