Télécharger Imprimer la page

Honeywell RTS-CSA Manuel Technique page 3

Publicité

Les langues disponibles

Les langues disponibles

• If work must be done on this equipment while standing on metal
or concrete, place insulative mats over a dry wood platform.
Work on this equipment only while standing on such insulative
mats.
• Never work on this equipment while physically or mentally
fatigued.
• Keep the transfer switch enclosure door closed and bolted at all
times. Only qualified personnel should be permitted access to
the switch interior.
• In case of an accident caused by electric shock, immediately
shut down the source of electrical power. If this is not possible,
attempt to free the victim from the live conductor but AVOID
DIRECT CONTACT WITH THE VICTIM. Use a nonconducting
implement, such as a dry rope or board, to free the victim from
the live conductor. If the victim is unconscious, apply first aid
and get immediate medical help.
• When an automatic transfer switch is installed for a standby
generator set, the generator engine may crank and start at
any time without warning. To avoid possible injury that might
be caused by such sudden start-ups, the system's automatic
start circuit must be disabled before working on or around the
generator or transfer switch. Then place a "DO NOT OPERATE"
tag on the transfer switch and on the generator. Remove the
Negative (Neg) or (–) battery cable.
Safety Rules ................................................. Inside Front Cover
General Information ................................................................. 2
1.1 Introduction ................................................................................ 2
1.2 Equipment Description ................................................................ 2
1.2.1 Transfer Switch Mechanism .............................................. 2
1.2.2 Utility Service Disconnect Circuit Breaker .......................... 2
1.3 Transfer Switch Data Decal ......................................................... 3
1.4 Transfer Switch Enclosure ........................................................... 3
1.5 Safe Use Of Transfer Switch........................................................ 3
Installation ............................................................................... 3
2.1 Introduction to Installation ........................................................... 3
2.2 Unpacking .................................................................................. 3
2.3 Mounting .................................................................................... 4
2.4 Connecting Power Source and Load Lines .................................. 4
2.5 Connecting Start Circuit Wires .................................................... 5
Operation ................................................................................. 5
3.1 Functional Tests and Adjustments ............................................... 5
3.2 Manual Operation ........................................................................ 5
3.2.1 Close to Utility Source Side ............................................... 5
3.2.2 Close to Generator Source Side ........................................ 6
3.2.3 Return to Utility Source Side ............................................. 6
3.3 Voltage Checks ........................................................................... 6
3.4 Generator Tests Under Load ........................................................ 6
Notes ....................................................................................... 7
Installation Diagrams ............................................................... 8
Warranty .................................................................. Back Cover
For authorized service,
reference the dealer locator
number found in the generator
owner's manual.
Table of Contents
1

Publicité

loading