Télécharger Imprimer la page

ATH-Heinl Flex Lift 30 Manuel D'utilisation page 60

Masquer les pouces Voir aussi pour Flex Lift 30:

Publicité

Les langues disponibles

Les langues disponibles

7. Lifting under load
a. Lift a load to appr. 500 mm height
b. Check that all the mounting points are in contact with the load. If all points are in contact with
the load, the lifting can be continued.
8. Fill in after installing the enclosed checking book.
This information will be required in case of a possible claim.
2.10 Completion of Work
Before commissioning, check all fastening screws, electrical, pneumatic and hydraulic
lines and, if necessary, tighten these. Warning: in some cases, this must be checked at
regular intervals and tightened if necessary (note in the instructions).
® Copyright ATH-Heinl GmbH & Co. KG, All rights reserved / Misprints and technical changes reserved / As of: 2022-03
Manufacturer ATH-Heinl GmbH & CO.KG
- 15 -

Publicité

loading

Ce manuel est également adapté pour:

Flex lift 30z