Positions Of Discharge, 0514-1826 - Rheem Raypak Raytherm D Serie Manuel D'installation Et D'utilisation

Ventilateur à tirage induit
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

9. POSITIONS OF
DISCHARGE, MODELS
0514-1826
A. Rotate Blower Housing 90° CW or CCW
(positions 1, 2, 3)
Disconnect pressure tube from blower housing.
1. Remove (6) screws that mount motor to blower
housing.
2. Remove (2) rear screws that mount motor to
support bracket.
3. Slide out motor.
4. Remove (2) screws that mount blower housing to
plenum collar.
5. Rotate blower housing 90° CW or CCW.
6. Reverse above procedure to re-assemble.
B. Rotate Plenum/Blower Assembly
(positions 4, 5)
1. Remove (8) screws that mount plenum/blower
assembly to jacket top.
2. Rotate plenum/blower assembly from position 2 or
3 so motor is toward front side of unit.
3. Reverse step (1) to re-assemble.
NOTE: Vent terminal should be installed with motor
toward either the right side or front side of the heater.
STANDARD POSITION AS
SHIPPED FROM FACTORY
FRONT
Figure 30. Blower Assembly Position 1
32
A
RIGHT SIDE
ROTATE BLOWER HOUSING
90° CW FROM POSITION 1
FRONT
Figure 31. Blower Assembly Position 2
ROTATE BLOWER HOUSING
90° CCW FROM POSITION 1
F
FRONT
Figure 32. Blower Assembly Position 3
GENERAL PARTS INFO: For power vent replacement
parts, refer to the Illustrated Parts list for the unit.
E
RIGHT SIDE
RIGHT SIDE

Publicité

Table des Matières
loading

Table des Matières