Ingeteam INGECON EMS Manager Manuel D'installation Et Usage page 39

Masquer les pouces Voir aussi pour INGECON EMS Manager:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 65
Appendix 1: Wattmeter
Connect as shown in the following figures.
11
L1
N
Single-phase installation*
*A jumper must be connected between points 1 and 4 of the wattmeter.
The wattmeter must be installed downstream from the power consumption and production
installation.
RS-485 communications are as indicated in the following table.
You must connect the end of line resistors between connection points 41 and 42.
See Section "2.4. Description of Connection Points" for information on the connection with
INGECON EMS Manager.
Consult the accessories manual for communication via RS-485 for more information on the RS-485
wiring.
A65+
Wattmeter with protective covers installed
A.
Connections
B.
The protective covers give protection against direct electrical contact. These must be removed to make the
connections and reinstalled once the connections are made.
AAX2022IQM01_ - Installation and Operation Manual
1
3
4
Connection
41
42
43
Joystick
C.
LED
11
1
3
4
L1
L2
L3
N
Three-phase installation
Signal
RS-485 A (-)
RS-485 B (+)
GND
1
2
3
4
5
6
7
8
E
31 32 33 41 42 43 51 52 53 54 55 56 57
A65+ wattmeter with protective covers removed
D.
Selector
Ingeteam
6
7
9
A
9 10 11 12 13
B
C
D
A
E.
Display
39
DE
EN
ES
FR
IT
PT

Publicité

Table des Matières
loading

Table des Matières