LAMS ALOE Instructions De Montage page 42

Table des Matières

Publicité

FIXING THE GREENHOUSE BASE TO THE GROUND
FIXING ON SOIL
• Position the greenhouse base in the desired location at a level position on a lled oor.
• Locate and mark the location of the base legs as shown bellow.
• Unter the four legs, mark a square of 300 x 300 mm and dig to a depth of 450 mm.
• Place the GREENHOUSE BASE, level it but CAUTION, do not ll the holes before the complete
assembly of the greenhouse.
4411 mm
(3166 mm
2544
FIXING ON CONCRETE SLAB
4411 mm
(3166 mm
2544
Niveau 0 - sol fini
+
1245
mm)
Niveau 0 - sol fini
+
1245
mm)
A
Earth or concrete lling
1922
It is strongly recommended
to ll the holes with concrete
for a better hold on the ground.
OR
Detail A-A
A
It remains to your free choice and decision to
use the suitable fastening means according to
the supports you chose (wood border, building
stones, cement plates etc.)
42
300 mm
Rawplug fastening inside
the greenhouse base
Screws and rawplugs
not provided
300 mm

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Aloe 9,70 m2Aloe 12,90 m2Aloe 14,40 m2

Table des Matières