BEST Range Hoods ICF6 Mode D'emploi page 8

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALL THE DUCTWORK
IFC6IQ Series
WARNING: To reduce the risk of fire, use
only metal ductwork.
1. Decide where the ductwork will run
between the hood and the outside.
2. A straight, short duct run will allow the hood
to perform most efficiently.
3. Long duct runs, elbows, and transitions will
reduce the performance of the hood. Use
as few of them as possible.
4. Install a roof or wall cap. Connect 10" round
metal ductwork to cap and work back
towards hood location. Use duct tape to
seal the joints between ductwork sections.
INSTALL THE DUCTWORK
IFC6IQ Series
1. Before making the holes on the ceiling,
unscrew the (8) screws (3.9x6mm) from the
upper support frame.
ROOF CAP
HOOD
24" TO 30" ABOVE
COOKING SURFACE
- 8 -
10" ROUND
DUCT
10" ROUND
ELBOW
DECORATIVE
FLUE
FIG. 5
HEIGHT
ADJUSTMENT
SLOTS
FIG. 6

Publicité

Table des Matières
loading

Table des Matières