Télécharger Imprimer la page
Les langues disponibles

Les langues disponibles

Liens rapides

H-4292, H-4293
STEEL PEGBOARD
• ALWAYS wear safety glasses when using any
power tool.
• ALWAYS use hearing protection when using loud
equipment.
• DO NOT sit, climb, hang or step on hooks or holders.
SUGGESTED TOOLS
• 24" Level
• Tape Measure
• Pencil
• Chalk Line
• Drill with #2 Phillips Screwdriver Attachment
SUPPLIES
#6 wood screws, 1½" to 2", with anchors.
PAGE 1 OF 6
1-800-295-5510
uline.com
SAFETY
• DO NOT overload hooks or holders.
• DO NOT try to install pegboard panels by yourself.
Use two or more people.
INFORMATION
GENERAL
1.
Install over studs, plaster or drywall.
2. Snap chalk line at desired height on wall.
NOTE: Screws may not always anchor into a
stud.
3. Mark all holes on wall before hanging pegboard.
NOTE: If hanging multiple pegboards,
mark ALL holes first.
Para Español, vea páginas 3-4.
Pour le français, consulter les pages 5-6.
0221 IH-4292
loading

Sommaire des Matières pour Uline H-4292

  • Page 5: Outils Recommandés

    H-4292, H-4293 1-800-295-5510 uline.ca PANNEAU PERFORÉ EN ACIER SÉCURITÉ • Portez TOUJOURS des lunettes de sécurité en utilisant • Ne surchargez PAS les crochets ou les supports. un outil électrique. • N’essayer PAS d'installer les panneaux perforés sans • Portez TOUJOURS un dispositif de protection de l'ouïe assistance.
  • Page 6 1/4 po lorsque vous utilisez le matériel d’installation pour panneau perforé H-4294 ou la trousse de démarrage pour panneau perforé H-4292. 4. Retirez le panneau perforé du mur. Insérez les ancrages dans les trous au mur. FIXATION DU PANNEAU PERFORÉ...

Ce manuel est également adapté pour:

H-4293