Under The Cabinet Installation; Preparation Before Installation; Hood Installation - KOBE CH9730SQB Manuel D'installation Et Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Preparation before Installation

NOTE: TO AVOID DAMAGE TO YOUR HOOD,
PREVENT
ENTERING THE VENT OPENING.
x
Decide the location of the venting pipe
from the hood to the outside. Refer to
Figure 1.
x
A straight, short venting run will allow
the hood to perform more efficiently.
x
Try to avoid as many transitions,
elbows, and long run as possible. This
may reduce the performance of the
hood.
x
Temporarily wire the hood to test for
proper operation before installing.
x
Important:
the hood (if any).
x
For installing under the cabinet with
recessed bottom, attach 4-inch wide
wood filler strips (not included) on each
side. Refer to Figure 2.
x
Measure and create access opening for
electrical wires and 6" round plastic
exhaust under the cabinet.

Hood Installation

CAUTION: If required to move the cooking
range to install the hood, turn off the power
on an electric range at the main electrical
box. SHUT OFF THE GAS BEFORE MOVING
A GAS RANGE.
1.
Puncture the knockout holes on the hood
as shown in Figure 3.
2.
Using
references
measurements on page 16 center the
hood in place beneath the cabinet and
flush with the front of the cabinet.
3.
Draw electrical wires through cabinet
access opening.
4.
From the bottom of the hood, place screw
(not provided) into the exact center of
each knockout hole. Make sure all screws
are in place before tightening screws.
CAUTION: MAKE
SURE THE HOOD IS SECURE BEFORE
RELEASING.

UNDER THE CABINET INSTALLATION

DEBRIS
FROM
Peel protective film off
on
Table
1
Figure 1
Figure 2
.
Figure 3
and
Figure 4
7

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ch9736sqbCh9742sqbCh9748sqbCh-97 série

Table des Matières